Show ACCIDENT AT Breaking of Engine Ne Mills Closing Th The breaking of the connecting rod C the engine employed to torun run the machine machinery at the mm mill Park City has ne necessitated the rinsing down or of that plant for a few For more than A year the engine hn h done Its work perfectly without m to denote an A flaw in the connecting rod however re suited In its breaking At a point about a foot from flOm the rank crank end Both ends nd of f the en engine ine were wrecked as Il a result ard it will be impo Impossible to resume un no until noI til I ii new parts arts are received from the These Man Manager er Er Ernest t Bamberger stated tat y yesterday erday afternoon had been shipped by express s and the e expectation tas a that they would arrive in time to tomake tomake make the n necessary ce sary repairs And start lIT again by the end of the week Duplicate parts for everything sup or e expected pe led to cause ause trouble in hi hithe the wear and tear of machinery at the trill mm and mine are TC alwAYs kept on band bandt to t meet at an emergency but this break was so far out of the ordinary that thE necessary par parts to make Inake aU all ro re pairs were ere not The mine will continue to operate u as usual the first class daa ore going om to mar and the milling ore taken out and aid stored In the bins which have kave am ampie pie capacity to tak care eare of o All that will ill be supplied durt during the Drier brief shut shutdown down clown of the plant |