Show SWILL CAMP Utah Fuel Company Preparing to Operate Mines at Willow Creek Price Nov movements of the employ of the Utah leads to the belief that another workings Ia to be opened at the Castle properties of the company up the known as Willow Crees For a week or more the surveyors nave been ground and they also the survey for the building of another lOG coke ovens along the yards at Castle Gate the Work L company urvey ru IL up Creek ft mile or to hoea of the 1 tab Ful it is proposed to put In a tipple and to work th claims by a tunnel The power at the Castle Gate mines from the Immense power there would operate the Willow mines by the stringing of more wire ao that no great outlay be made for new ma All the coke made at Castle Gate for a year or more comes from the Sunnyside mince of the company the coal there he heing ing of a much superior quality over the Castle Gate product the ovens at Gate would be operated hi to the Sunnyside ones of and more water facilities at Castle Gate The water problem at i to tobe be solved by the company going over the hill to Range Valley and storing by the system and conveying the water to Sunnyside camp by digging a tunnel some feet through tue eore of the mountain This will coSt many thousands of but Is an an for next summer In fact the contract for the work has been let to John of Sunnyside He bias done considerable for the company |