Show IRAS EZRAS TALK COSTS MONEY Contractor on Fir Pire Station Stuck for Because of May MayS Mayrs S ors rs Assurance o 0 Chytraus who 00 was to have had the contract for tor the new No 5 fire station which the American coun councilmen have baye decided not Dot to build owing to the bankrupt condition of the general fund is out about I O AS the result of an assurance by Mayor Thompson that the city In Intended to bund build thc station and that Chytraus should have the contract When the council first approved the contract Mayor Thompson ye ve vetoed toed it because f a technical defect Then Chytraus went to the mayor mayorS S and a asked ked him if there was as any dan danger ger that the station would not be t 4 built Mr Chytraus says the mayor told him that the station would sure surely ly Iy be built and that he Chytraus should have the Acting on that Chytraus about worth of material materia including heavy f joists cedar blocks for the floor and cut stone atone Monday the finance committee de deckled that the city could not afford to build the station and Monday night w when n the amended contract came jn in from the board of public works the council sidetracked it IL 11 Mr is w wondering who win will re reImburse reimburse him the OO which he has spent 4 It 4 t t 4 4 t 4 t |