Show GETTIXG OUT TIlE FLANS Bids Soon to Be Requested on the New Sioux Plant Plans and specifications arc being prepared for the new mill of the Sioux Consolidated Mining and Milling company com-pany and it is anticipated that within the next few days bids on the plant will be TZClue ted It is to be a 20 stamp concentrator but so arranged that 20 more drops may be added at any time The general plan is much the same as that of the Mammoth Mining company near which it is to be situated I Some tdme ago the hoard of directors I of the company authorizzed General Manager Robinson to proceed with the construction of the plant which is provided for in the agreement drawn i up at the time of the recent sale of the majority of the capital stOck to Mr Robinson and his friends The company i com-pany made a contract with the Mammoth i Mam-moth people for a sufficient water supply sup-ply to operate the mill and the mains of the new Cherry creelc system are to be tapped at a point a short distance from the Mammoth mill where the new plant is to be erected Manager Robinson has placed a small force of men at work in the Sioux property and is doing some development work 1 gdtting the mines into proper shape for extensive operations I |