Show JUNE Tp T SINK Gold Mountain Property to be Br h to Water Level Long Jr l return ret rn to oRI CoI I Mountain biday at once eee proceed with the erection e lolI ble build 8 for r I the tb th inoc a Olt of or the men who are to be pl at J s the June J ne Bug BUI during the winter During hi his stay tay y be he will let a contract for tot putting tUnc down a shaft front rom the Ute tunnel evel level or to a depth where water may Interfere with Uk the work A month mont or two wo ago o a rich h body bed of 1 ore ere fourteen feet teet wide was cut la In the Ute tunnel werk lags and it was sufficiently explored to demonstrate its permanency nency The new Dew work to Is calculated to show allow the charac ter of the tile ore at water level and no time will be lost t in lii reaching that tbt point paint The property to is under und r bond to the Western Exploration company and ud it is to ton In n that organizations ol interests that the new is 18 to be performed Mr lIft Long expects to be away aay about two weeks w |