Show MIXING MINING 1 IG NOTES Col D C C Jackling general manager of oC Utah Copper and allied aled companies arrived home yesterday after ater a two weeks visit to the tho mines of or Arizona Arzona and New Mexico development of or which ho Is directing He reports satisfactory satisfaCtory tory tor progress of or mill mi building and oth otil other other er or operations at Ray Consolidated and of preparations for building the largo large reduction works planned for Chino China Copper Development of or the ore oro bodies In both properties Is 18 proceeding with the usual ulua good results The drill dri In No o 3 well wel at Mt Pleas Pleasant Pleasant ant entered the shale dur during durIng ing lug the last lat week week While a flow fow of oil 01 Is not yet yot assured the change chango of formation greatly greaty encourages the operators With the Bradley Brdley shaft shat of or the Tin Tintic Tintic tic Mines company at nt the level preparations for lor Installing a hoisting plant plant are being made made A portion porton of or orthe the tho machinery machIner Is II on the ground Continued Improvement of or the show showIng showIng showing Ing in the tho level lel of ot tho the mine at Tintic Tin tc is reported reported Drifting both ways upon the tho to vein Is in progress and the tho prospect prospect of or en encountering encountering countering an ore body like that opened in the upper levels Is II regarded excellent Tho The ore oro which Is being shipped from tho the mine about about three carloads a 0 week comes from the tho and 00 levels lavels |