Show NEVADA CON ABOUT TO START NEW SHOVEL PIT Ely EI Nev Ncr Juno uno 24 The Nevada Consolidated has baa ha at present five tle steam shovels and seven churn chur drills drils at ot work In the pit at Copper Flat Flat Most or ortho orthe orthe the tho machines are aro employed In removing removing In ing overburden as a one shovel work workIng workIng working Ing two shifts can cn usually lood load enough ore oro to keep the concen concon concentrator concentrator supplied On the Liberty claim about abut half hRU a amile R amile mile mie west of ot Copper Flat the ground has been ben cleared of ot sagebrush a rail railroad rai railroad road track has been laid and every everything everything thing thine put In readiness to commence removing overburden as an a soon as tho the new steam shovels arrive arho which were ordered several months ago a 10 The Nevada Neada Northern Railway com company compan pony pan has ha ordered 75 6 more Ingoldsby ore cars of the same de dc design d sign as the now In use but of ot uso greater grater capacity Tho The new cars cr wilt will wil carry 60 tons tOI of ore while the tho capac capacity crr fly ity of the old ones Is rated at 50 tons although Iy they are usually loaded to albough about 53 63 3 tons ton Two new engines will wil also be bo received by bi y the Nevada Neada North Northern Norther ern er em this month One of these thele will wil be used for tor handling ore cars on the tho trestle at the tho concentrator while the theother theother theother other ice Ico wilt will wil go Into the tho passenger serY service ser serIce |