Show El Y CON CUTS ORE OREIN OREIN IN NEW WORKING East Drift From American Shaft Gets Results Near Big Dike DikeT T Tn u it ilu t tt h east PARt drift on nfl th toot level le 1 c u shaft of th the Ely Et Cnn Coit CO US 1 Cop Copper cr company hn hs ha t 1 d 1 inches of l cop Op copi I 1 i p is the vord ord received r ein d yesterday 1 L er S M lv lAn Levy The west drift n Ivel has lias for iome time been beenu t it u I 11 HU II the tit top of t a promising shoot of or I 1 hT ore On but the tIny strike Just made madei i 1 i first fint for the east drift I st t drift is out about 15 feet ft from t Itt and it is nearly due to tap lap the pi pt 1 i 1 v y dike which was wae as the original oi Ok Q iu point Conditions favor for enrich r I 1 at t the th intersection of the fissure v i ho he dike diket u L t this hia I latest development every 3 1 I working in Ely lIy Consolidated I with vitI one exception haa has opened than it i I r t as liS early eurl as 12 or earlier v no lit according to 10 the the working was had baaed ba tl The uon 11 is the west est iii drift on the t the I h ih Brilliant shaft which while t ni Ift 10 n oros fissure and aud 1 isu I 4 through some Iome ore on the way i ft et reached the contact for or which t i i ing i il driven The record is an all un lilt uni i no fl to tn bo be made In ground where t conditions were the only guide guidero guiden ro n r showings are in III both drifts drift f 1 American shaft in the cross eross crossi 0 f i u Ii j from frunt till the t h Brilliant shaft and andr 11 r and 11 south drifts and twenty 1 SUt ut in ill the tho III Zak Zack working workings |