Show El ELY Y CENTAL FAST PROVING ORE BODY Clipper Shaft Shaf Has Been Driven Feet in I I Solid Sold Sulphides Ely El Nov Ne Feb 22 On the Ely Cen Con Central Central Contral considerable new machinery was Installed during the week a new sta eta station station tion pump having been be on put in at the level of ot the Eureka shaft and an another another another other boiler boier added to the equipment of the Clipper The Tue Eureka will wi be I continued with wih three compartments which means the tue timbering of ot the third compartment for about feet only The latter was discontinued at a depth of ot feet to permit the driving of a through it the quicker to reach tiie tue fault faul of the steam shovel pit pit At the Clipper shaft hatt every days development is proving up a larger ore body The big No Xo 9 Cameron pump installed last week has proved more than capable of handling the water into the shaft The flow fow Is at atthe atthe atthe the rate of 15 gallons a minute The shaft shat yesterday was down feet is 77 7 feet below blow where the sul sulphides sulphideS were encountered which means that the Clipper has an ore body 77 7 feet in thickness and amI the ore in the shaft shaf is looking better beter with wih every shot that thatis is put Into the tho hole |