Show MELTING SNOW PLAYS HAVOC AT RESERVOIR SpecIal to The Richfield Jan recent thaw which melted the snow aU all alan along the Se Sevier vier rIver played havoc at the Plute Piute res site where the Western Vestern Construe Construction tion company has a force of men putting In the core for the proposed dam Tile The melting s snow ow filled the channel of the river washed out a temporary dam and filled up tho excavation made In the river channel An engine and boiler boHer used for fot pumping the water where flere th men were at work was surrounded by water five I feet deep and aU all work had to be stopped |