Show BUILDING WATERWORKS FOR THE KNIGHT MINES Work was as started this week upon a pipe line Une which is to o convey water from Silver Sliver City to the various Knight mines mince including the Black Jack Iron Blossom Dragon Colorado and others says the Eureka Reporter The Swansea water as well welt as the water which is 13 being purchased from the Gemini will ill be discharged in a big storage reservoir which is s now being constructed near Silver City and a big pumping plant will be installed to pump the water reservoir to the va YR various various rious mines The water will run from this reservoir to the smelter without pumping Work upon the pipe line to the differ different dIfferent ent mines started the early earl part of the week under und r the direction of William Homer A big force of men will be put putto putto putto to work and the line Une rushed along a as rapidly as possible but even under tn tin tilt most favorable conditions it will wilt require a couple of months to complete comp te the job |