Show DEVELOPMENT WORK AT THE IRON KING CON Superintendent Nick Roberts of the theIron th thIron theIron Iron King Consolidated property states that Lou Coleman and Charlie May are going along pretty rapidly with the work in the big tunnel says the Eureka Reporter They are handling the tunnel tun tunnel nel ael work under contract and at this time are in a distance of about 1000 IOVa feet It will require about 2060 2000 feet more work to drive the tunnel beneath the big iron blowout and about feet teet of work remains to be done before the tunnel is connected up with the shaft It is the opinion of some of the best informed mining men that an im immense immense immense mense deposit of high grade ra e ore Kill 1111 UI be encountered when hen the tunnel reaches a point below the iron The w rk through the shaft at theIron the theIron theIron Iron K ng includes a drift which is be being being being ing run rUil to the west wet from the level leveland leveland leveland and another drift which is being pushed out in the same direction dire from the lex level el These drifts are now in a dis distance distance distance tance of nearly 00 feet from the shaft and are rearing nearing one of the strong VP eins OiS which traverse the Iron King ground A few tew days ago the drift on the broke into a small cave or open fissure and Superintendent Roberts states that this cave contains some splendid Indi Indications Indications indications of ore being lined with man manganese manganese manganese and quartz Mr Roberts in intends Jends tends to do a few f w feet of sinking In Inthis inthis Inthis this cave within the next few days das as aa the showing is so encouraging that It would not do to pass It up entirely |