Show WORK BEING STARTED ON RAILROAD TO CONTACT CONTACTS S B Robinson locating engineer for the Oregon Oreon Short Line paid a visit to the Salmon river dam a few days das ago alo and in conversation with Assistant Engineer Gil Gilbert Gilbert Gilbert bert stated that he had received orders to rush the work on the Twin Falls to Wells VelIs branch of the railroad with all aU pos possible possible possible sible haste says sa S the th Twin Falls Tribune The portion from rota Twin Falls Fall to a point in the neighborhood of the Point ranch will be started with the construction crew on the heels of the locating party part No K 4 were made by Mr Ir Robinson as to the time for tor the completion of this section but Assistant Engineer Newell Kewen I who was not going to be caught napping started out the following day and begin beginning fling ning at a point on the branch In the southern part of section IS township 11 H i south range rane 16 6 east ran out the prelim preliminary inary mary location for the spur to the dam darn I which involves some seven miles of track It is the plan to deliver freight directly I to the dam daft without transferring at Twin Falls This is the road that is to connect with the copper cop lr mines at Contact Nev but the Southern Pacific terminal will not be beat beat beat at Wells a l stated but at lit t Valley Valle Pass between Wells and Cobra |