Show J t SLEN REFUTES f REGARDING rc t CITY'S WATER PLAN JF i sT statements that the city I is seeking to obtain water t be e easiest manner rather than eni en- en i to procure a lar large e supply sources other than the Wasatch ratted C. C C. C yesterday isa Is- Is a a st statement of this phase of or the tion as follows ItU Ull the city engineer and other I cipal officers I have visited every i within a a. radius of miles t Lake and have havo Investigated r reasonable scheme and run down r rumor which has been called to After thorough n it has been bee estimated the cost ater brought from the head of ot the tho thoo o 0 Weber eber or Strawberry rivers will rom om two and a half hal to three times uch for tor the same amounts as we J to pay for water from the tho atch watershed d if It the tho proposed propose J calling for Cor the issuance of or n bonds is carried at the special lon tIon of or a. a April 27 |