Show PAYSON ROAD BIDS HELD TOO HIGH WORK OR J DEFERRED For tho second time proposals to construct con con- cn- cn the tho state highway between Spanish Span Span- pan pan- ish ishi Fork and nd Pa Payson son were rejected 1 by bythe bytho tho the state tato highway commission when yesterday the tho three bids bills submitted for forthe tho the work were turned down by the commission slon on the ground that thc they were too high All J bids were higher than tha time the previous bids and In one of or ortho tho the proposals there was a serious error In c calculation 16 ton Ih The The- matter mater will wil now go 10 over o er until V after the first of March when it i la is believed that in view of oC the fact fat the tho railroads will wi be returned to their I owners that better beter rates can bo ho se secured so- so Ie-I Ie cured cure for the tIre shipment of road material material material ma ma- than can now how 10 be hail had ha thus re reducing reducing re- re time the cost o of construction The bidders were B. B B n 13 B. B Brinton whose proposal was a rate of ot per mile Owen H 11 Gra Gray 3 lG 0 mile or per mie an and Wattis- Wattis Samuel company 1501 1 or per mile This included the tho states state's cost cst of or 5 1671 I 1 on the work tork Time The estimate c of ot the road commission lon was a total I cost of or or OS 1 I per mile mie |