Show EARL HARBOR i fr r f DRYDOCK DONE a BY NEXT JUNE neat reat Pacific Mid Pac Station 1 Work E Is Approaching I Completion arbr by b The mall a The great Pear Pearl nay na al al O station drydock dr do which 1 In oral r l proC process Of or eon co construction for r fit f June dune Years will b bc be a completed b by and ready for Use uso b by th thoa thc rg t. t battles oa o n h official hips next fall ac according I t statement by local arm army y ylo fl lo ceremonY It U le Is nn announced will t first opening and closing ol of bU huge ge e o of f the caisson ga g o for the reception Deception n first lIr to o war have ship nally It It wa was s the he event e observed ed b bJ that monies but tho the thoo war has ha s Ih Work on n the I earl 1 be w Harbor navy na In urft 1300 when preliminary it ys sere rc I the made m for fr from clee opening c 1 n nn nO d 1 channel from tiro tho and for open This dredging out the lino bar at tilt ears earn before i work worl required several severa lb the tho aa begun un actual cons construction t r 1110 has hOR had ad several tle the tV grave u at of which occurred Os' Os more nu r years car eara thin than a a ago o anti and d. d delayed a ed the worl mire bottom n a rear ear theme At that time th the of th blow ining nU all up USI that use or of the d had bo been n done Th fe red wai 8 1 th-f th that disaster IC engineers dl cov the t za out dredged botton Softer aa ih than the adjoining t 1 I f n 1 1 I and amI the pressure of or the latter caused causell the thc bottom to blow up as 18 If It a n. huge charge o of ot dynamite had been exploded under un er It After J n a long dela delay a new of ot construction was adopted Instead of or pouring concrete on the bottom huge concrete blocks were molded These were floated out and let lct down clown to tho bottom anchoring It It Tho rho Pearl Pe-arl Harbor drydock Is la big enough to accommodate the tho largest battleship afloat or projected 1 |