Show NOTICE ro TO IonS NOTICE IS HEnDY GIVEN THAT sealed bids will wil be received h by the tue undersigned up UJ to 2 p. p in I. I December I IS jq q In 1912 for tho tire materials and labor Jabor required in hr tho erection of or tho ho ut Utah State Capitol building in ii Salt Lake Uth City Utah according to plans spec spec- and drawings which are arc open for tor Inspection at the lie office of ot Richard Kletting architect ilS O Felt Fel building build build- In ing Salt Sal Luke City Utah and alt all al bids bid and proposals I at the tho above time will wil be publicly opened and read rEd in the theoffice theoffice office of or the tho thO State Capitol commission 21 Felt el building Salt Lako CI City Utah Uth All Al bids must bo be a addressed to Utah State Capitol Commission Salt Lako Lake City Utah and marked In iTt tho lower hand loft corner corer Bid Dd for Utah Uth Capitol building naming naminG at tho the same Bara time tho the kind or kinds hinds of ot work which tho the bid covers for tor example Bid for tor ton excavation or such bids can Cn bo Lo de delivered I livered to the Capitol commission at leI le- le the tho I salt said all time and arid place for tor opening same me Bids Dils must not hot contain conditions qualifications propositions or an any other tiring thing than tho mentioned In in- plans I specifications drawings contracts and bonds bonis and anh bidders must use uso tho tIne form torm of or bids Lids which winch will wi be bl found Cound at t tho of ot- ice of or sail said architect and no other form forum of or bl bid will wi bo Lo received A certified check or cashiers cashier's check checkon on some bank In Salt Lake Lako City Utah Uth for Cor at least 5 1 per Ier cent of or tho the amount of or each bid hid must be bo enclosed Each chisel check Is to ho bo made malla payable to tho the und undersigned anti and Is to be forfeited to tine the undersigned In case the bid Is I accepted curd and th the bidder er does doos not enter Into tire the contract within ten days af after r rIs Its Is acceptance for the faithful execution lion tion ton of or tho the contract anti and bond hereinafter hereinafter herein herein- after mentioned Tho The proposed form torn o of contract shall be the Uniform Contract Contract Revised 1907 and md the form of ot bond to be bo used usel is hereto appended A bon bond must b bo be furnished for tor one- one half haIr tho the amount of or the tho bid with good and sufficient sureties all al satisfactory sool to the tIre undersigned The plans and specifications will wm 1 be open for Inspection and use at tho tIme architects architect's office In iii rooms Hf- Hf tO Felt Fel building and at tIme the office of or the tho Utah Uth State Capitol commission 1 Felt b building u i Id ii K Bids must be bo submitted per cubic yard Estma Estimated td amount t of or excavations excavations excava excava- 2000 cubic yards The Tho undersigned shall have the te right to reject any or r all al bids 11 and to waive an any informalities in Rn army any proposal Dated at Salt Lake Lako City Utah this th day ilay of oC December 1912 I UTAH STATE CAPITOL COMMISSION |