Show I I I BiOS BIDS ON CAPITOL WilL BE OPENED No Action to Be Taken Today Nor Until Return of Governor Governor Governor Gov Gov- Spry I This afternoon at 2 o'clock tho the bids of ot contractors for tor the tho building of the state capitol will bo bl formally opened b by tho thu state slate capitol commission Action Action Action Ac Ac- I tion on tho the bids will bo deferred hower however however how how- ever er till the tho return of or the governor from the cast east about nine nino dave das days hence tabulation tabulation- of or orthe It Is expected that the the tho bids bid will take talco about a n week especially espe espe- daily an several smaller contractors are bidding on portions of the work while the larger concerns bid for tor the tho whole thole job which by tho estimate of or the architect must not co cost coat t more than Tho contractors contractor are aro all In irs town nn and 1 their checks covering 6 B per pOl percent percent cent cont of their contracts a. a as J guarantees of ot good faith f are aro ready to be presented to tho capitol commission In the tho advertisement for bids the thc state capitol commission lon says It does hot obligate ato Itself to accept the lowest lovest or 01 any an bid bl |