Show BECK CONTRACT AGAN AGAIN DISCUSSED Action on on- Proposal to Penalize Pelal- Pelal Penal i ize e Contractor May Be BeTaken BeTaken BeTaken Taken Today Whether tho the contract hold hol b by J. J W. W Mellon Mellen for tor paving pa Beck Deck street from SL St St Marks Mark's hospital north to tho the Davis ls Da county count line lino lne Is to bo be canceled will wil bethe bo be bothe bothe the question queston 1 before eforo tho the city commission commis commis- commission sion don at Its It meeting tota today Heber Robot M. M J Wella eUg commissioner of streets ha has recommended to tho the other commissioners commission ers ore that such action acton bo be taken as a means of or penalizing the contractor for not beginning operations so HO that the tho improvement might be bo completed this year car carTho Tho commission made mado an nn Inspection of ot the tho street yesterday afternoon It I was found toune that Mellen Meilen Iolen has not Tot begun excavation for tor paving pa but Is II en engaged a ed edIn In putting the street In such condition that It I will wil be passable during the tho win win- ter tr Mr Ir Wells Wels sa says if It paving work was sas be begun un now frost trost would como come long before tho the job could be finished The matter mater was discussed In tivo session Hession by the commission last night night None one of ot the commissioners would give 1 an any Information as ns to the result of their conference but It Is understood understood un un- un- un a decision was reached not to commence laying of ot pavement this taU fall Paving of ot Church street as a moans of relieving drainage conditions there and arid on Fourth South bot between Main and State was suggested at the tho cl city commission corn com om- om mission meeting last Jast nl night ht b by Commissioner Commis M M. M Mells I. I Wells ells when whon P. P H. H RIley nile Itt RI- le ley iel appeared before the commission to urge that something alon along that line linebe lne bo be done Mr Ir said sall the abutin abutting property owners will wil probably be bo In favor of ot paving pa He has worked out a plan for Cor draining draining drain drain- In ing the district and after aCer his talk with wih the commission aran arrangements were made mado for a conference at which he will wil explain It to Mr Ir Wells ells and the city engineer |