Show FURTHER SLIDES EXPECTED EXI Panama June 28 The 28 The alido on tho west side of or the Culebra cut section of the thc Panama canal north of ot Contractors Contractors tors bra hill hm haH closed the channel to ships having havinga a draft of ot more moro than twe six twenty t feet teet The Tho slide HIlde though only onh onha a temporary one Is regarded as tho the forerunner of ot an important earth movement move move- ment along the tile entire west bank for tor a distance of or feet north of ot Contractors tors tora hill and 1500 feet back from the canal axis including a a. large section of Zion hill bill |