OCR Text |
Show TRAFFIC OH SALT ) LAKE ROUTE TO RESUME FRIDAY Tests will.be made tomorrow of Salt Lake line tracks recently repaired after af-ter two months of unceasing1 work, and at a cost, including loss of business, estimated es-timated at dose to $1,000,000. The heavy rains in Nevada and near the California line, washed away tracks, bridges, culverts, embankments and telegraph poles, crippling the entire system sys-tem and entirely preventing through traffic. If 'nothing further occurs to prevent the resumption of through traffic, trains will be running to Los Angeles from this city Friday evening. The roadbed, road-bed, however, is not as solid as before the washout, and much ballasting will have to be done. - Local business on the line has been np to the average ever since the washout. |