OCR Text |
Show MINES AND MINERS. ' Mr. II. A. Lane, superintendent of' tho Eurelcn-Ophlr at dishorn, visited the metiopolls Monday. ' It Is expected thnt the mill at the mouth of the dialn tunnel will be completed com-pleted and- In operation by March 1. 1 1901. i Work Is still going on on the lilac k. Diamond, although that propuity has not yet been thoioughly dialned by thy I tunnel, , i Mr. C. .1. Garber, superintendent of the Dty Canyon Con. of dishorn, and wife passed through Stockton Wednesday on their way to Salt Lake City. W. C. Reynolds nnd George Williams, Wil-liams, who linve been woiklng on th- I Mairinon mlno at Dry Canjon. cntne down Monday. It Is doubtful If the ' will resume woik on this propeity nil present. Last Saturday a serious accident oc- I ourred In the Hone'rlne tunnel, wheteby, one man wns feilously hurt and two otheis recolvod slight Injuries. The i o'clock shift, when "spitting" tho fuo , to blnst. lingered too long nnd wetel not nt a safo distance when tho blasts ocourred. "Jock" May. shift 1)oj-h, whs struck Intliftback by flying rock and i severely Injured, but Inst repot ts were, favorable for his recovery. Everette Glenn and Lars Johnson were Hlnhtly hurt, but nre abler to be at work again. |