Show MUST ANSWER SOON the public utilities commis commission ion has g given 1 e n the rio grand grande e until feb 10 in which to ans answer er the demand for information to the cost of opera operating tin co d over oer the summit ahe 1 he request for the information came rs as a result of the filing of a demand by various arious shippers and cr or for fer a lowering of the rate if the answer cannot be given the hearing hearin on the demand for loei i rates will continue if it is gien all the caso cases casos s dealing with rates including the railroads request foi an increase of 15 cents will be considered together |