Show contract let for the public library committee has let a contract for the grading of the lot where the new public library will be built to thomas franks the contract price is 00 mi franls franks has put on a plough and scraper A trap is erected where the dirt can be easily loaded and the work will be pushed forward as rapidly as possible last week several men were put to work at daye days pay but it vaa was found that this method would take too long and the cost would be too great and for that reason the contract was let last saturday |