Show city aits s application for funds summarized esca CS applied for to fo be spent on water system for power P plant a nt labor estimated at 2 balance for materials material s for the benefit of 0 our readers locally who axe are anxious to kildar somo details concerning the cites application for public works administration funds with which it is proposed to improve the cites wat ir er system ana aiu power plant we are attempting to summarize thit that application so tar far as tile the prop propose oseI expenditures tures are arc concer ed at the outset we should slat that at some figures herein raly not cot be absolutely accurate but the total applied for Is correct and the th other figures are near enough for to 1 the purpose of this summary we WB have copy ot of the original application and have tried for three weeks to get a copy of the amended sect I 1 ion 1011 which is known to have been received but which cant be local locadd td d i by mayor recorder or Attorn attorney oyd j and which itce accounts for some doubt as to exact figures as they ai ti I 1 cost coat of pipe tor for the power plant and installation of water dut but as previously stated the figures herein are substantially correct water ater system costs the proposed expenditures tor for the water system are as follows MATERIALS ft 6 in flow pipe ft t 8 1 m n pressure pipe 2050 ft 6 in pressure pipe ft 4 in pressure pipe ft 2 in pressure pipe 12 ire fire hydrants water meters with curb boxes estimated 5 I 1 valves goose necks and I 1 1 miKel laneous steel tor for storage tank I 1 cement for storage tank lumber tor for storage tank 1 sand gravel tor for stora sterns s j tank SOC 00 io valves etc tor for storage talk materials for or wells LABOR LA BOP hauling pipe and distributing in place trenching drenching Tren ching backfilling back tilling at a foot 00 laying pipe at ac a toot foot taking up and relaying ft 2 in pipe labor on oil storage tank 1 labor drilling 2 wells miscellaneous and contingent costs engineering legal costs rights ot of way 2000 1 the council feels that sonic some of the above estimates are higher than I 1 actual 13 will be particularly the labor items but all are as es 1 I 1 timatea by the engineers except tin item tor for meters As to these the thea meters alone will cost 1200 each the curb box lid and to thesel these must be lidded added concrete tor for making curb hex necessary fittings etc 01 ol total mat materials aerials should run between betwee 16 and 17 for each meter the r latter figure was used in the above I 1 estimate i expenditures tor for the improvident 0 of the power plant are to be as to low I 1 MATERIALS feet 26 in it pipe 17 18 materials fater fals for or pipe supports and intake works LABOR hauling PP from cedar and tor for welding labor tor for building pipe PIP supports welding points point 1 I sa 00 labor in intake works 1000 00 engineering legal services and contingent the total tor for the two projects ai previously stated Is of 0 which tell amount or thereabouts is requested as ai a direct grant or gift to the city as contemplated in the t act the hotance balance will have to be paid back by the city with interest on an amortization plan over a period ot of 30 years to repay this loan the city 76 ot of the net revenues pledge from the water vater system 1116 2235 a y a aud 3 32 1 of 0 the |