Show ERB CONTENTED WITH CONTENTE WIT CONTRACT FOR fR USE OF V JAMES PEAK TUNNEL Denver to Have All Al Mineral Rights and Will Wil Pick Out V Engineer a 1913 1313 b by the tho to Pr Pres Pre's s Publishing C Co Denver Cola Cob July 29 President President Erb V of at th the Denver Salt Sal Lake Lako railroad said toda today he ho was well wel satisfied with the final terms of ot the contract be between between between be- be tween the city and the railroad company company com corn V pany for tor construction and operation of ot the James Peak tunnel The Tho contract will wi be submitted to the directors of the road cad for or their approval I The Tho contract provides for the en enlarging enlarging en- en I of the tunnel so as to permit the tho conveyance of oC water through it for us use for tor domestic or Irrigation purposes pur pun poses on the eastern slope of the range the reservation In perpetuity for the ct city of all al mineral minerai rights of the tunnel the selection of or the engineer In charge j or of the construction b by th the tunnel commission com corn mission the right of the city to bring flower r nO transmission linon th this thA tunnel lunn- l and d-c d equal i i rights s for for thc h use se-or se of V the thc tunnel railroads 1 It I Is now believed b by the tho commission that an election to authorize the Issuance is issuance Is- Is 1 of or bonds can be bo held between beten September 15 and October c ober 1 1 j |