Show CO CONDUIT DUIT IS COMPLETED O. Special to Th Herald Thid Th final Ogden Oct 26 with tho the wore Vera mado made this morning Cold Water ater Canyon conduit which provide provides provides pro pro- vides vide tho the city with wilh a double system of ot mains from the tho reservoirs on tho the foothills and the upper sources of ot the tile city's water supply Including Cold CoM Wa- Wa ator a to toc tor canyon canon O Ogden river end and Wheeler creek Tho The dela delay In completing tho the connections wa was deemed advisable b by bythe the city engineer until both reservoirs were full as the work would necessitate necOs- necOs shinto shutting oft off the tho water nater in both mains for tor a short time |