Show BLUSTER OF JARBIDGE AND PATSY CLARK Spokane Wash asim Oct 14 Sixty five Sixty five her er cent of time tho capital stock of 1500 In shares of a par value of 1 1 each of the Bluster Mining company of Jar Jar- Nev has been taken on option and bond by Patrick Clark of Sp Spokane at 50 cents a share thus placing a valuation val val- of on the property Development De Dc- work will vill continue under the he present management until Mr Clark takes charge of the tho property The company ima has and shares of stock In its treasury Mr Clark who recently Inspected the property jointly with John Bresnahan lit s planning to do some Independent development work beginning within thirty days and meanwhile the company corn com pany driving two crosscut crosscut cross cross- cut tunnels to tap the tho ledge So far as development has proceeded proceed proceed- ed the workings show a foot fifteen edge between two iwo perfect walls with every Indication of permanence said Mr Clark These workings to date are riot not very extensive the principal opening being a sixty foot shaft with witha a short drift from its bottom in both directions The average value of time tho ore thus exposed is 30 per ton most of the value being In gold but suf- suf in silver to bo be of Importance The ore Is free milling and arid and capable of being cheaply mined amine and treated The ledge runs with the mountain and can be tapped by cut cross tunnels tun tun- ads nels to a depth of 1000 feet or more at the rate of foot for foot A depth of more than 2000 feet can be gained a n time the same way at slightly greater cost The country Is ideal for extensive exten oxton- sive operations being welt well watered and timbered something quite unusual In Ina a Nevada gold camp |