Show US I. I Construction The Utah Department of Transportation announces rolling lane restrictions on Interstate 15 as crews resume a project to repair highway bridge joints The following lane restrictions will be in place as crews mark test and cut the old joints 1 April 12 NB 15 1 will be restricted to two lanes between 1700 South and South from 8 pm p.m. to 6 am a.m. The WB Interstate 80 ramp to NB 15 1 will be closed during during during dur dur- ing those hours 2 April 15 13 NB 15 1 will be closed from South to North From 8 pm p.m. to 6 am a.m. nightly NB 15 1 will also be restricted to two lanes between 1700 South and South from 8 pm p.m. to 6 am a.m. nightly The WB and EB Interstate 80 ramps to NB 15 1 will also be closed 3 April 19 19 16 NB 15 1 will be closed from South to North From 8 pm p.m. Friday until 6 am a.m. Monday NB 15 1 will also be restricted to two lanes between 1700 South and South The WB and EB Interstate 80 ramps to NB 15 1 will be closed during this time Weekend restrictions will continue until October mid or until weather conditions allow A detailed schedule will be released weekly During the 15 1 re-construction re project contractor used steel dowels dowels dow dow- the concrete roadway with the concrete bridge to join els discovered the decks During routine inspections dowels were causing the concrete surface to crack at some locationS Crews Crews' will win be repairing 60 structures and more than joints this year Wasatch Constructors insurance company will P pay y for all repairs at no Io cost to the yer y advised to visit Motorists are er and to call Utah's free Travel Information Line to find the latest construction and road condition updates updates' recommends motorists reduce speeds and use caution when driving through work zones Work schedules are subject subject to change due to problems sit sit- si problems or emergency inclement inclement weather equipment Nile Easton j o |