Show ft lewis to have new water system A complete new water system will be installed at fort lewis A M colleg this fall it was announced today by charles oale ale rae president of at the san juan basins only institution of higher learning work on the will commence sept 17 with the arrival of equipment and laborers the contract for the project has been awarded to theother Theo ising of grand junction colorado with a bid of lb eising who also built the city market building in durango has a to complete the present project within sixty days E engineers ngi for the fort lewis water project are A L kroeger and son of durango it is estimated that the entire costs ot of the development will be including the contractors bid plus the cost of two i pumps chlorinator power line extension arid and collection pipes the new water supply system will replace the present system which has become obsolete after twenty five years ot of use the project will rehabilitate about one foot of water waiter from the lory springs located one halt half mile north ot of the fort lewis campus and will provide improved water facilities both for irrigation and for domestic use |