Show cane springs rood road job gets final OX OK the state road comm isison on friday approved its 1950 primary M ary and secondary road pr pro 1 1 gram tc alling for the expenditure of for state and federal highway construction and improvement included in the list of projects is the cane springs dugway 15 miles south of moab on highway US this two mile stretch of unimproved road will be constructed to federal standards at an estimated cost of it is understood that all surveys on the job have been completed and that the road project will be advertised at once I 1 the 1950 program aiso aiso includes the replacement replacement of several bad bridges on high highway ay US 50 between Green river and the colorado state line at an estimated cost of the new bridges will complete the of unsafe bridges on 50 through grand county the 1950 program carries a project between price and helper on US 50 including three major and two minor bridges and acquiring rights of way iway for a proposed four lane highway between the two cities |