Show frost implement co moves into modern building this week marks another milestone in the progress of the frost implement company under the management of melvin frost as the new building on center street east of main was completed and made ready for occupancy floor space 32 by 60 feet with about 1000 square feet at the front half for display of case machinery will accommodate a lot of farm equipment and machinery there are also twice the old number z of bins bin s in ahe the new building for repair parts and some space for other articles although mr frost said they will concentrate on case machinery and parts for repair work there is a ramp connecting the half balf basement at the front of the building with the main floor which section will be used for storage space repair work will still be taken care of at the corner building although eventually the space back of the the new building will be converted into a shop and the old blacksmith shop to the west of the building will be torn down and the space used as a yard A neon sign has been installed and will be used as soon as electricity is available the wiring is completed but the fixtures agrenot are not yet in place A talk aphone connecting the corner shop and the new building is another modern convenience which intrigued us while on a tour of inspection on monday it was used several times within a short space of time brov ing its worth and usefulness in an interesting way office space spa ceis is also planned for and when this section is completed the new frost implement company compan y building will be as modern as is is possible to make it congratulations melvin on the progress you have made since you took over the management of this enterprise ter prise |