| Show I 1 UNDER DIRECTION OF STATE ROAD WORK GOES ON our state stale tills this week started on the road work which atis begni 11 lust list fall in tile the verdure venture section the cutting town tit the hill there claude It attey state road enz engineer enzinger ineer in ahm ire ge of work in otis locality va ras 4 advised blynt the two miles of rond work commenced tr tit lie ile finished now and 20 men and I 1 tennis teanis ave alre at work thlu with tile 91 0 tile contract now just bust started gives miles of new graveled rond N ilich added to the six wiles leave lebei jonly only a little left out of the 22 miles between lie tween monticello find Il landing that wa will 11 not soon lie le a stan standard daril diry road |