Show officials make tour of moon lake dam and outlets tuesday horace L allred president of the moon lake water users association and B 0 colton water commissioner for the lake fork uintah and duchesne river systems in company with E J er construction engineer and air crow of the reclamation s service ervice made a tour of inspection of the moon lake darn dam and outlet works tuesday mr aured allred reported constructions 1 and mechanisms to be in clock work order and said thac tha the lake will be filled during dign water time in the month of may when filled the lake will hold more than acre feet of water which can be used later in the season as needed contractor T E connolly will VM move all equipment from the dam site within the next 10 days but a few finishing up jobs will be in progress probably until the th e middle of the summer at the present time there are approximately second feet of water being released from the lake for water users on the lake fork side |