Show school board planning A full school term the regular re ular monthly school board meeting was held in duchesne tuesday february ath with all members nieTO liera 0 of the board present excepting L D gardner of neola who was unable to he be present A from tabiona fabiona met with the board ie questIng them to assist in installing water line connecting the school with the community main the matter was tabled for tile th time bein with instructions for investigation A large delegation dele gaVion represent ing elementary tea te achsia cheis ot of f district met in the interest of schedule adjustment for the next school te term rm the matter was referred to the superintend superintendent ten dent for a complete study ot of the request which will be reported back t to the board tor for consideration the new central high school building which lias las been under construction and is now bearin ne arin completion came in for considerable discussion and study by the board A report of the progress pro giess on tile the building was made and further steps were taken to rush completion of tills this project C C Mick elsons financial report showed that extreme cate caie must be exercised by all cong ansern ern ed cd it if a full tern term 0 of school is 11 held tins tills year |