Show U P L building new bridge at plant the uintah power light corn com pan is is building a nw new bri brage ige ovier the uintah river at the power plant which will replace the one which was washed out by the high water a year ago a 0 o last i E B murphy ot of upalco is in charge of the th work the rock work including the approaches a P pro aches and two peers have been completed ss rs well as two shore spans leaving the 60 foot center span yet et to be constructed the shor shore s spans are 21 24 feet and 30 feet respectively the timber for the he center span la Is now being gotten out by the saw mill toe bridge when wh en completed will bs be a substantial structure and should withstand any flood waters |