Show work again resumed on federal aid road east of roosevelt work of completing the fel deral aid project highway fi aiom orn roosevelt to the uintah river was resumed monday when the reynolds eka construction company put i force of men on smoothing off the gravel from the uintah river to indian bench which section of the highway is ia almost completed the power shovel which has been overhauled anal anad repaired was put to work breaking up the stock pile of gravel and loading trucks work on the project was halted shortly after christmas due to the aro anro longed longe J stretch of intensely cold weather anid ani 1 the breaking down ot of the shovel foreman J J miller is in charge |