Show work on highway to ft duchesne will start in near future work on the state highway con Bt ruction on the project from roo evelt to the ur tah tab river will probably start very boon the ely rey rcy construction company ali who 0 were awarded the contract have started to move their equipment to the project A large steam shovel is now at castle gate and will be unloaded and brought to the basin this thia piece of machinery weighs 40 tons and will be hauled by a caterpillar er tractor reynolds and miller were vere over the project last week and resident engineer R A gillis has a force of surveyors at work and has established an of ice at roosevelt |