Show LAYING OF WATER MAINS i IS NEARING completion the roosevelt city water department completed the laying of water I 1 mains from first north to second north streets on main alain street an and I 1 have taken up the old pipe on th tha a block front from first south to second south on hall street replacing i the same saine with new pipe they have also put in about two hundred feet feer of four inch pipe on con state strict from lagoon street south lr in all cases the new pipe has been placed live five feit feet drop so as to overcome the difficulty encountered from freezing of the mains inaina hillard broderick liag has contracted the back tilling filling of the trench anil and has hag the work nearly completed |