| Show will inspect uintah basin roads inspection of 0 all completed federal aid highway projects and those under construction as far south as aa st george was besun begun yesterday by joseph ecung engineer for or the united states bureau of public roads 14 S kerr assistant chiel chief engineer tor for the state road commission will join mr young at duchesne cli esne monday august 23 to make an investigation of the froitland fruitland Due besno connection into the basin with a view to selecting the most practical route far this road |