Show OIL WELL IN TODAY ON THE VERNAL STRUCTURE some minor parts to the steam fitting of 0 the machinery at the til oil anell of the utah refining com P anys well on the vernal structure in the ashley valley were received tuesday evening and the well was studded in today wednesday active drilling operations will now be maintained until the test lest of the oil bearing sands are reached those in charge of the operations are very sanguine that the test will give to the world another I 1 oil field which will be a grent great factor in the development of the uintah basin |