Show Notice To Water Users Notice is hereby given that the U. S. Department of the Bureau of 32 Exchange Salt Lake lias filed a request for extension of time from the State Engineer to make and submit Proof of Appropriation under Application covering of water to be diverted from West Fork Duchesne River which is tributary to Duchesne tributary to Green River in Duchesne to be used for irrigation It Is represented that features of the Bureau of Reclamation's Moon Lake Project under which this application are fully constructed and include the Moon Lake Dam and appurtenant Yellowstone Feeder Canal and diversion Dam and dike and appurtenant Duchesne Feeder Canal and diversion and the Total cost of the project development was The water appropriated under this application Is stored in Reservoir and used by exchange with the Ute Indians on the Moon Lake Water Users' Association To the Indian lands have not been developed to the extent that full exchange of the water under this application can be Additional time is necessary in order to complete the appropriation of this water and submit Proof of Protests resisting the granting of said request with reasons must be submitted in duplicate and filed with the State State Salt Lake on or before October A hearing will be held on this request before the State Engineer at a. m October at the Protestants should appear at the Hubert C. Lambert ACTING STATE ENGINEER Published in the Uintah Basin Standard from August and September |