Show Water Users from Page under the state law if a reservoir is constructed with more than 20 acre feet of capacity it has to be approved by the state engineer and I come under the rules of his One rule makes it I sary that an efficient inspector be on the job throughout the construction period THE CONSTRUCTORS of the Big Sand Wash which are the Moon Lake Water must pay the cost of the inspector A fied Frank has been loaned by the Bureau of Reclamation and is presently on the job while construction is pushed He is working very closely with the engineering film of Todd and who designed the flam The Bureau of Reclamation offered some suggestions to the constructors that might improve the dam They suggested moving the tunnel outlet from the front to the middle of the dam They also suggested changing the type of gate valves to correspond with the same type they had used to a good advantage in many instances The third change was enlarging the spillway about one AFTER CAREFUL study the changes proposed by the Bureau were incorporated into the plans and when the job is done this idea will be a part of the project A slight delay was caused in the but now activity is going ahead at full In addition to his assignment on the Utah Water Users board Holgate is president of the Moon Lake Water Users Association and has been extremely active on various committees pushing toward creation of the Cental Utah |