Show Forest asks Moon Lake road bid Bids for construction of 56 miles of Forest Development road to Moon Lake were advertised according to D. G. Forest Ashley National Forest THE BIDS WILL be in at p.m. May 1963 and work is expected to begin June with calendar days allowed to complete the This project was necessary to provide improved access to Moon Lake and the Lake Fork area of the Ashley National Forest The present low standard road can longer safely serve the increased traffic in that The road will be constructed to a two lane oil DEVELOPMENT of an adequate transportation system to serve the and water resources is an important of the overall development program for the National The program is aimed at optimum development and integration of all National For est resources so that maximum contribution will be made to the economy of the rural areas surrounding the Ashley National The work will consist of cubic yards of roadway and drainage excavation cubic yards of tons of aggregate tons of crushed aggregate tons of crushed aggregate surfacing TONS OF bituminous material will be used and lineal feet culvert two treated timber bridges and three 24 Additional information may be obtained from the Contracting U S. Forest Service St. or Forest Ashley National |