Show Remodeling project of chapel underway A remodeling project is underway at the chapel now being used by the Roosevelt and Roosevelt Second Church of Jesus Christ of Latter-day which will correct a few much-needed structural and modernize the building that was erected in FOR NEARLY three decades the which was built under the direction of Ray E. then bishop of the Roosevelt housed the ward and Roosevelt Later when two wards were the building became a 2 ward-stake Over eight years ago under the direction of Hollis G. who was president of the the two Roosevelt wards were divided and four were For approximately five years the building accommodated four wards and the When the new stake See back page Remodeling nac H center was completed nearly four years ago the Third and Fourth wards and stake moved to that building leaving the old stake center for the two wards now supervising the remodeling ACCORDING TO Merrill J. Roosevelt and Bishop Arvin Bellon of the Second who jointly arc directing the remodeling it Is estimated the job will cost with another for The majority of the funds are to be supplied by the two with some assistance coming from the Third and Fourth wards and the This arrangement is per an agreement entered into when all units of the church were using the old Supervising the project Is Wayne J. Cromar of Salt Lake who received his assignment from the general church building Most of the labor will be donated by the four with the church matching funds used to do the ALL CLASS rooms arc being which includes tile floors and improved Two completely remodeled bishop's rest Relief Society along with an extensive Job In the such as additional and redesigning the rostrum and choir section arc In the The job is expected to be completed in early a date that is contingent on tho response coming from church members with donated labor and 1 v |