Show Vernal unit will operate in 1962 season Most portions of the Venial segment of the multi-million dollar Central Utah Project of the Colorado River Storage will be fully operational early next engineers for the Bureau of Reclamation Region said Tuesday Work on service which will carry water from the located miles north of has been halted by weather said Alton construction project The which Ls about 90 percent will carry supplemental irrigation water to acres of farm land and an estimated acre feet of culinary water to one or more communities in the work on repairs to the 2 6 miles of feeder canal used for a short time last is proceeding at reduced also because of weather engineers The Ft Thorn burgh diversion dam on Ashley Creek was completed last It was used for a time until the feeder canal developed trouble in drop structures built into the canal to control erratic flows of the The structure would prevent erosion of the channel while making water in excess of existing rights on the stream available for Repair of the drop structures a ill be completed by according to the present at a cost of about engineers said a principal feature of the project designed to provide acre feet of off-stream storage from the excess Ashley creek was completed in |