Show Portable garages started by school board Construction is being started on 10 more portable school bus garages for the School District's bus transportation Rowan C. Stutz states Kermit the district's building reported to the school board that construction would be started right away on these additional Ray bus will assist with the construction work and Mrs Hazel will work in his place at the school lunch center for a few Clarence bus will assist with the as will Delmore when he is not on duty at the bus maintenance assisting Eldredge The garages will be built on the Duchesne High School One completed garage is there now and will be used as a shop while the other units are being built Eight of the garages completed last year have been assigned to locations at or near the route Built at a cost of about a the units are made of wood frame and with corrugated metal |