Show Vernal selected as load center for power WASHINGTON Vernal has been designated one of eight now load centers or delivery points for the electricity generated by the Colorado River Storage Senator Frank Moss has Commissioner Floyd E. Dom-iny of the Bureau of Reclamation has informed Moss that under a proposed project power will be delivered St Vernal and Flaming These locations replace Sigurd and Heber proposed by former Secretary of the Interior Seaton as the only two delivery points for and Senator Moss change will provide broader coverage for Utah for which I have been When Secretary proposal was I protested that additional load centers were This plan will make project power available to municipal and REA customers throughout the State of Dominy told Moss that the new Utah locations were designated after a request by the new Secretary of the Stewart for a review of the proposed transmission line locations and delivery |