Show Notice To Water Users Notice is hereby given that Utah Water and Power by J. R. State Salt Lake Utah has filed with the State Engineer a request for an extension of time In which to make and submit Proof of Appropriation of water under Application for the appropriation of of water from Duchesne River in Duchesne County to be diverted through the Gray Mountain Canal and used to irrigate land in Duchesne and Uintah It is represented that has been spent on project Which is now All protests resisting the granting of said with reasons must be In affidavit form and filed with the State State Capi Salt Lake City on or before October A hearing will be held on this request for extension of time before the State Engineer at the County 10 00 a.m. October Protestants should appear at the Wayne D. Criddle STATE ENGINEER Published in the Uintah Basin from 18 to |