Show Work resumed on ward chapel After a lull the cold winter construction work has started on the Bridge-land Ward Chapel in the Duchesne 13 was the original starting date on the building states Bishop Carl Van Tassell anticipated completion date is August of this year It will be used by the 55 families and others in the which was merged with the adjacent Arcadia Ward in Nov of 1057 The frame building with red brick veneer has a chapel seating capacity of seven class a 33 X 55 foot recreation hall that features glass bank boards A kitchenette is a part of the Relief Society room Coal will be used as a heating fuel It is located In the same area of the old which was torn down two years ago Since the merger of the two wards the Arcadia chapel has been used for I ward Angus Bishop is construction supervisor with Ardon Evans as A Hale Holgate heads the building committee and committee members arc Ardon Reed Finance committee is Eldon chairman and Lee |